| Price: | Negotiable |
| Payment Terms: | L/C T/T |
Featuring an innovative all-in-one architecture, the system integrates a 261.248kWh high-voltage LiFePO₄ battery, a 125kW Deye three-phase hybrid inverter, GSL Energy's intelligent Battery Management System (BMS), Energy Management System (EMS), liquid cooling technology, fire protection system, and cloud monitoring platform into a single outdoor cabinet.
Compared with conventional energy storage systems that require separate battery cabinets, inverter cabinets, and control systems, the Product significantly simplifies engineering, shortens installation time, reduces commissioning costs, and improves long-term operational reliability.
Designed for both on-grid and off-grid applications, the system supports peak shaving, load shifting, energy arbitrage, backup power, solar self-consumption, demand response, and Virtual Power Plant (VPP) participation, making it an ideal energy storage solution for factories, commercial buildings, industrial parks, hotels, shopping malls, EV charging stations, renewable energy projects, and microgrids.
The product adopts a highly integrated cabinet design that combines every critical component required for commercial battery energy storage into a single factory-tested system.
The integrated solution includes:
This factory-integrated architecture minimizes on-site wiring and engineering work while improving installation quality, reducing commissioning time, and lowering the total cost of deployment.
It is ideal for a wide range of commercial and industrial applications, including: